Asbestos Cement Water Main Replacement Program

Spalding DeDecker (SD) is helping the City of Novi with a multi-year project that will upgrade the aging asbestos-cement water mains that are located throughout the City.

First, SD developed a city-wide asset scoring system to evaluate each segment based on age, size, location, and break history, establishing probability-of-failure and consequence-of-failure ratings to prioritize replacement needs. This planning tool helped the City plan $15 million of improvements into phased construction years.

With phasing in place, SD provided full design and construction engineering services for targeted replacements, including roadway, storm sewer, and driveway restoration. Narrow roadways and installation restrictions required innovative traffic control plans to maintain residential access during construction. The completed improvements deliver a reliable water system, enhanced neighborhood roadways and sidewalks for Novi residents to enjoy.

Keywords Asbestos cement water main upgrades, water main asset management program, ac pipe prioritization replacement, Novi capital improvements, planning, water main engineering and surveying, municipal water system replacement, residential water system upgrades.

Client City of Novi
Location Novi, MI
Date Completed Ongoing
Markets Public Infrastructure

Project Highlights

Designed a scoring system to assess city-wide infrastructure

Developed a plan to prioritize $15 million of water main replacement

Performed design and construction engineering for the 2022 phase of the replacement plan

Overcame challenges such as narrow roads and installation restrictions with innovative traffic solutions

Our Team of Experts

Project Team Members

Our dedicated team of professionals ensures every project meets the highest standards of safety and quality.

01 / 02
Taylor Reynolds, PE

Taylor Reynolds, PE

Senior Project Manager

Ted Meadows

Ted Meadows

Vice President | Construction Engineering Director