Selfridge Non-Airfield Improvements

Spalding DeDecker (SD) is providing full design, survey, and hydraulic engineering services to relocate sections of the Irwin and Tucker Jones Drains. This project supports the planned 1,000-foot runway extension and taxiway improvements at Selfridge Air and National Guard Base (SANGB). Along with the drain work, the perimeter fencing and roadway need to be relocated, and culverts need to be upsized to accommodate new design parameters and regulations.

Key challenges for this project include meeting strict hydraulic and environmental standards, addressing upstream flooding, and mitigating waterfowl activity that poses risks to aircraft. Additional complexities involve coordination with FAA and military clear-zone requirements and maintaining base operations during critical roadway closures. SD’s proposed solutions introduce new drain alignments with reinforced channels to control erosion and deter waterfowl, improving safety and long-term resilience for vital military infrastructure.

Client Tetra Tech, Inc.
Location Harrison Township, MI
Date Completed Ongoing
Markets Airports

Project Highlights

Supports planned 1,000 ft runway extension and taxiway improvements

Relocates segments of the Irwin and Tucker James Drains

Modifies the perimeter fence and roadway to accommodate relocation

Upsizes the culverts for new design standards and regulations

Our Team of Experts

Project Team Members

Our dedicated team of professionals ensures every project meets the highest standards of safety and quality.

01 / 02
Scott DeVries, PE

Scott DeVries, PE

Senior Project Manager

Mike DeDecker, PS

Mike DeDecker, PS

Sr. Vice President, Sr. Project Manager