Latest Update
Construction Update
Oct 11, 2024
Check out the 2024 RH Concrete Road Program Overview Below!
The contractor will continue to address deficient items such as mailbox repairs and restoration.
We thank all the residents for their patience and cooperation during the construction process!
Read More
Construction Updates
Construction Update
on Oct 11, 2024
+
Check out the 2024 RH Concrete Road Program Overview Below!
The contractor will continue to address deficient items such as mailbox repairs and restoration.
We thank all the residents for their patience and cooperation during the construction process!
Construction Update
on Sep 27, 2024
+
Construction Schedule: Week of September 30, 2024
All Streets
Concrete work, joint sealing, and restoration have been completed. Several areas remain to be addressed, along with miscellaneous clean up work.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
Construction Update
on Sep 20, 2024
+
Construction Schedule: Week of September 23, 2024
All Streets
Concrete work has been completed. Joint sealing and final cleanup on all streets. Restoration continues throughout the entire project, with an anticipated completion date of October 1st.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
Construction Update
on Sep 13, 2024
+
Construction Schedule: Week of September 16, 2024
All Streets
Concrete work has been completed. Joint sealing and final cleanup are scheduled for the week of September 23rd. Restoration continues throughout the entire project, with an anticipated completion date of October 1st.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Sep 06, 2024
+
Construction Schedule: Week of September 9, 2024
Buttercup Drive
Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
Stonetree Circle
Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
Parkland Ct
1) Complete restoration.
2) Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
Essex Drive
1) Begin restoration.
2) Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
Grosvenor at Harvard
1)Open the final section of the new pavement.
2) Begin restoration.
3) Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
Salem Drive
1) Continue restoration.
2) Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
Summit Ridge
1) Begin restoration.
2) Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
Wales Drive
1) Open the new concrete ramps along Dutton Road.
2) Restoration TBD.
3) Major work completed. Joint sealing and final cleanup scheduled for the week of September 23rd.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Aug 30, 2024
+
Construction Schedule: Week of September 2, 2024
NO WORK IS SCHEDULED ON LABOR DAY HOLIDAY
Buttercup Drive
Major work completed. Joint sealing and final cleanup scheduled for mid September.
Stonetree Circle
Major work completed. Joint sealing and final cleanup scheduled for mid September.
Parkland Ct
1) Pour remaining driveways.
2) Continue restoration.
3) Joint sealing and final cleanup scheduled for mid September.
Essex Drive
1) Allowing cure time for Phase 3 concrete.
2) Restoration TBD.
3) Joint sealing and final cleanup scheduled for mid September.
Grosvenor at Harvard
1) Pave Phase 3 concrete and sidewalk ramps.
2) Restoration TBD.
3) Joint sealing and final cleanup scheduled for mid September.
Salem Drive - Phase 2
1) Begin restoration.
2) Joint sealing and final cleanup scheduled for mid September.
Summit Ridge - Phase 2
1) Remove barricades and construction debris.
2) Restoration TBD.
3) Joint sealing and final cleanup scheduled for mid September.
Wales Drive
1) Pave sidewalk ramps at Dutton Road.
2) Remove barricades and construction debris.
3) Restoration TBD.
4) Joint sealing and final cleanup scheduled for mid September.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Aug 23, 2024
+
Construction Schedule Week of August 26th, 2024
Buttercup Drive
Complete restoration.
Stonetree Circle
Complete.
Parkland Ct - Phase 2
Begin restoration.
Essex Drive - Phase 3
1) Continue Phase 3 demolition and base preparation in the westbound lane.
2) Pave Phase 3 Essex Drive in the westbound lane.
Grosvenor at Harvard - Phase 3
Phase 3 demolition and base preparation and paving in the northeast corner.
Salem Drive - Phase 2
Waiting for concrete strength results.
Summit Ridge - Phase 2
1) Continue base preparation and form installation in the westbound lane.
2) Pave the westbound lane.
Wales Drive
1) Continue base preparation and form installation in the northbound lane.
2) Pave the northbound lane.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Aug 16, 2024
+
Construction Schedule: Week of August 16th, 2024
Buttercup Drive
1.) Complete paving the intersection at Vardon Drive, residential driveways, and sidewalk ramp.
2.) Continue restoration.
Stonetree Circle
Complete.
Parkland Ct - Phase 2
1.)Complete paving the eastbound lane.
2.) Continue pouring concrete driveways.
Essex Drive - Phase 3
Begin Phase 3 demolition and base preparation in the westbound lane.
Grosvenor at Harvard - Phase 3
Awaiting concrete strength results for Phase 2 concrete.
Salem Drive - Phase 2
Pave concrete in the westbound lane.
Summit Ridge - Phase 2
Continue removing pavement and base preparation in the westbound lane.
Wales Drive
Begin demolition and base preparation of the northbound lane.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Aug 09, 2024
+
Construction Schedule: Week of August 12th, 2024
Buttercup Drive
1.) Backfilling behind new curb between Goldenrod and Vardon. Residents can reinstall sprinkler heads once the dirt is placed and compacted approximately 3" to 4" below the top of the curb.
2.) Begin removing the final section of pavement in the southeast corner of Vardon Drive.
Stonetree Circle
Complete.
Parkland Ct - Phase 2
1.) Begin removals for Phase 2 construction in the eastbound lane.
2.) Begin preparations for concrete paving.
Essex Drive - Phase 2
1.) Placing and grading aggregate base in the eastbound lane.
2.) Begin concrete paving in the eastbound lane.
Grosvenor at Harvard - Phase 2
1.) Continue removals and placing the aggregate base in the northwest corner of the intersection.
2.) Concrete paving in the northwest corner of the intersection.
Salem Drive - Phase 2
Begin removing pavement in the westbound lane.
Summit Ridge - Phase 2
Begin removing pavement in the westbound lane.
Wales Drive
1.) Final grade the aggregate base in the southbound lane.
2.) Pave the concrete in the southbound lane.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Aug 02, 2024
+
Construction Schedule: Week of August 5th, 2024
Buttercup Drive - Phase 3
Backfilling behind new curb between Daylily and Goldenrod. Residents can reinstall sprinkler heads once the dirt is placed and compacted approximately 3" to 4" below the top of the curb.
Stonetree Circle - Phase 2
Restoration. Residents can reinstall sprinkler heads.
Parkland Ct
Phase 1 is now open.
Essex Drive - Phase 2
Begin removing pavement in the eastbound lane. Installing edge drain and aggregate base in the eastbound lane.
Grosvenor at Harvard - Phase 1
Possibly begin Phase 2 work.
Salem Drive - Phase 1
Complete the concrete paving in the eastbound lane.
Summit Ridge - Phase 1
Complete the placement of aggregate base and concrete forms in the eastbound lane. Begin concrete paving in the eastbound lane.
Wales Drive
Continue earth excavation in the southbound lane and at the Dutton Road approach. Begin installing the edge drain along the west side of the street. Begin placement of aggregate base at the Dutton Road approach.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Jul 26, 2024
+
During the week of July 26th:
Buttercup Drive - Phase 3 -
Complete concrete paving in the westbound lane from Vardon to Goldenrod.
Stonetree Circle - Phase 2 -
Restoration.
Essex Drive - Phase 2
Possibly begin removing pavement in the eastbound lane at the end of the week. Notices will be sent to residents.
Grosvenor at Harvard - Phase 1
Allow cure time for new concrete.
Summit Ridge - Phase 1
1.) Complete the removal of existing pavement in the eastbound lane.
2.) Continue installing the edge drain along the south side of the street.
3.) Continue placement of aggregate base and concrete forms in the westbound lane.
4.) Begin concrete paving in the westbound lane.
Wales Drive
1.) Begin the removal of existing pavement.
2.) Begin installing the edge drain along the west side of the street.
3.) Reconstruction at the Dutton Road intersection.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20233'%3E%3C/svg%3E)
Construction Update
on Jul 19, 2024
+
During the week of July 22nd:
Buttercup Drive - Phase 3 -
1.) Continue removing existing pavement in the westbound lane from Goldenrod to Vardon.
2.) Continue installing the edge drain along the north side of the street.
3.)Begin placement of aggregate base in the westbound lane.
Stonetree Circle - Phase 2 -
1.) Allow cure time for new concrete.
2.) Pour concrete driveways.
Essex Drive - Phase 1
Allow cure time for new concrete.
Grosvenor at Harvard - Phase 1
Allow cure time for new concrete.
Summit Ridge - Phase 1
1.) Begin removing existing pavement in the eastbound lane midweek.
2.) Begin installing the edge drain along the south side of the street.
3.) Begin placement of aggregate base in the westbound lane.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20222'%3E%3C/svg%3E)
Construction Update
on Jul 12, 2024
+
Construction Schedule: Week of July 15, 2024
Buttercup Drive - Phase 2
1) Begin removing existing pavement in the westbound lane from Vardon to Goldenrod later in the week.
2) Begin installing the edge drain along the north side of the street.
3) Open the entire northbound/eastbound lane to traffic.
Stonetree Circle - Phase 2
1) Complete the paving of the northbound lane.
2) Allow cure time for new concrete.
Essex Drive - Phase 1
1) Complete Aggregate and form work.
2) Pave Phase 1 concrete.
Grosvenor at Harvard - Phase 1
1) Complete the concrete removal and earth excavation.
2) Install edge drain along the south side of the street.
3) Place aggregate and forms.
Parkland Court - Phase 1
1) Begin concrete removal and earth excavation.
2) Begin installing the edge drain along the curb line.
The construction schedule is weather-dependent.
For questions please contact Grady Rollins, Project Manager.
734-968-8633 | grollins@sda-eng.com
We are looking forward to working with you toward a successful construction project!
Construction Update
on Jul 05, 2024
+
During the week of July 5th:
Buttercup Drive - Phase 2 -
1.) Complete the placement and grading of aggregate in the northbound lane, north of Daylily Drive.
2.) Complete the paving of northbound/eastbound lane from Vardon to Daylily Drive.
3.) Allow cure time for pavement.
Stonetree Circle - Phase 2 -
1.) Continue removal of concrete in the northbound lane.
2.) Continue installation of edge drain along the east side of the street.
3.) Begin placing and compacting the aggregate base on the prepared subgrade.
4.) Begin paving the northbound lane.
Essex Drive - Phase 1
1.)Remove concrete and excavate earth.
2.) Place aggregate and forms.
Grosvenor at Harvard - Phase 1
1.)Remove concrete and excavate earth.
2.) Place aggregate and forms.
Parkland Court - Phase 1
Begin concrete removal and earth excavation.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20225'%3E%3C/svg%3E)
Construction Update
on Jun 28, 2024
+
During the week of June 28th:
Buttercup Drive - Phase 2 -
1.) Complete removal of concrete in the northbound/ eastbound lane from Vardon to Daylily Drive.
2.) Complete installation of edge drain along the south/east side of the street.
3.) Continue placing and compacting the aggregate base on the prepared subgrade.
4.) Begin paving northbound/eastbound late from Vardon to Daylily Drive (delayed due to weather).
Stonetree Circle - Phase 2 -
1.) Begin removal of concrete in the northbound lane.
2.) Begin installation of edge drain along the east side of the street. 3.) Begin placing andc compacting the aggregate base on the prepared subgrade. 4.) Pave concrete driveways along the west side of the street.
No work will be performed July 4th - 7th.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20225'%3E%3C/svg%3E)
Construction Update
on Jun 21, 2024
+
During the week of June 21st:
Buttercup Drive - Phase 2 -
1.) Continue removing concrete in the northbound/ eastbound lane from Vardon to Daylily Drive.
2.) Continue installing edge drain along the south/east side of the street.
3.) Continue placing and compacting the aggregate base on the prepared subgrade.
4.) Begin paving northbound/eastbound late from Vardon to Daylily Drive.
Stonetree Circle - Phase 1 -
1.) Awaiting new concrete in the southbound lane to obtain strength.
2.) Begin removal of concrete in the northbound lane, possibly by Friday, June 28th.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20225'%3E%3C/svg%3E)
Construction Update
on Jun 14, 2024
+
During the week of June 14th:
Buttercup Drive - Phase 2 -
1.) Begin removing concrete in the northbound/ eastbound lane from Vardon to Daylily Drive.
2.) Begin installing edge drain along the south/east side of the street.
3.) Begin placing and compacting the aggregate base on the prepared subgrade.
Stonetree Circle - Phase 1 -
1.) Complete removal of concrete in the southbound lane.
2.) Complete installation of edge drain along the west side of the street.
3.) Continue placing and compacting the aggregate base on the prepared subgrade.
4.) Pave concrete in the southbound lane.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20225'%3E%3C/svg%3E)
Construction Update
on Jun 07, 2024
+
During the week of June 7th:
Buttercup Drive -
1.) Complete the placement and compaction of aggregate base on the prepared subgrade.
2.) Complete installation of concrete forms.
3.) Complete paving of westbound/southbound lane from from Daylily Drive to Goldenrod.
Stonetree Circle -
1.) Continue removing concrete in southbound lane.
2.) Continue installing edge drain along the west side of the street.
3.) Begin placing and compacting the aggregate base on the prepared subgrade.
All construction work is weather dependent.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20225'%3E%3C/svg%3E)
Construction Update
on May 31, 2024
+
During the week of June 3rd:
Buttercup Drive -
1.) Continue to remove concrete in the southbound lane between Daylily and Goldenrod.
2.) Install edge drain along the west side of the street.
3.) Place aggregate base on the prepared subgrade.
4.) Begin installing concrete forms.
Stonetree Circle -
1.) Begin removing concrete in the southbound lane mid-week.
2.) Begin installing edge drain along the west side of the street.
All construction work is weather dependent.
![](data:image/svg+xml,%3Csvg%20xmlns='http://www.w3.org/2000/svg'%20viewBox='0%200%20300%20225'%3E%3C/svg%3E)
Construction Updates Coming Soon
on May 17, 2024
+
Stay tuned for construction updates for the Rochester Hills Concrete Road Program! Locations include: Buttercup Drive, Essex Drive, Grosvenor Drive and Harvard Drive, Parkland Court, and Stonetree Circle, Wales Drive and Summit Ridge Drive.
Questions? We have answers
If you have any questions or concerns about the project, we are here for you. Our project manager is here to answer any of your questions. Feel free to email or call us at any time.